Senior Technical Advisor

MSc Sven Feige

Sven Feige holds a degree in Environmental Engineering and Environmental Protection (MSc). From 2001 to 2003 he worked as a project engineer for Pro2 Anlagentechnik GmbH, a German producer of technical gas utilization equipment. At Pro2, he was responsible for design and project management of combined-heat-and-power systems fuelled by landfill gas and biogas. Since October 2003 he has been an independent consultant in EU emissions trading and gas capture and use. Beginning in 2006, before joining Perspectives in 2007, he worked with Perspectives as an external consultant on a regularly basis and developed a new baseline methodology for energy efficiency projects.

 

Phone: +49 2203 94 22 662   I   Contact form


Consultancy Projects

CDM/JI Projects and Methodologies

Project Name Client Project Description Location Duration
CDM methodology development CH4 avoidance EnBW CDM methodology revision of AMS-III.F (methane avoidance through co-digestion of pulp and wastewater) International 2010
Hydro Power confidential Desk-based due dilligence including official Vietnamese documentation Vietnam 2010 - 2011
CDM Feasibility Study Boil-off gas confidential CDM Feasibility Assessment for boil-off gas projects Qatar 2010
CDM Pre-Assessment (two technologies) confidential CDM Pre-Assessment of two technologies not specified 2009-2010
CDM Feasibility Study Pyrolysis confidential CDM Feasibility Assessment for a waste -to-energy project - 2009
Grid Emission Development confidential Development of the Grid Emission Factors for several countries several 2009
New energy efficiency project type confidential Risk assessment report for a new type of CDM project in energy efficiency with regard to methodology applicability and additionality confidential 2009
CCNG Allplan PDD review and improvement Macedonia 2009
CDM methodology development CCS confidential CDM methodology development for CCS projects international 2008
Osram PDD Development Osram GmbH Development of Project Design Documents for CDM projects covering the operation of CFLs in households (energy efficient lighting). Initial projects: "Visakhapatnam Osram GS CDM project" and "Yamunanagar & Sonepat Osram GS CDM project". international 2007 - 2008
CER- Channelling Vietnam confidential Brokering of CERs from more than 10 potential CDM hydro power projects in Vietnam with a total volume of 1,900,000 CERs until 2012 in collaboration with our Vietnamese partner VNEEC Perspectivs is not longer involved in brokering. Vietnam 2007
CRIEPI III - Meth-Development Central Research Institute of the Electric Power Industry Development of 2 CDM methodologies for:
  • Replacement or refurbishment of fossil fuel-fired steam boilers. The CDM-EB approved the submitted methodology as AM0056 in August 2007.
  • Greenfield supercritical coal-fired power plants. In September 2007, the CDM-EB approved the consolidated methodology ACM0013 "New grid connected fossil fuel fired power plants using a less GHG intensive technology”, which is largely based on Perspectives' methodology submission.
international 2005 - 2007
CRIEPI II Central Research Institute of the Electric Power Industry| Hamburg Institute of International Economics Evaluation of the submission and approval process of energy efficiency CDM methodologies. international 2005 - 2006
Technological CDM potential Confidential CDM feasibility study for a potential CDM project in India for a world-leading supplier of power plant equipment India 2006

CDM Capacity Building

Project Name Client Project Description Location Duration
Biogas confidential PDD review and improvment of municipal solid waste biogas project India 2010
Biogas Govermental Purchase Programm PDD review and improvement of 2 PDD biogas projects Thailand 2010

Climate policy analysis, other studies

Project Name Client Project Description Location Duration
GTZ CDM Highlights GTZ Writing of GTZ' monthly newsletter "CDM Highlights" international 2010
Potential and challenges of benchmarking in the CDM Department for International Development (DFID) Analysis of the potential of benchmarking approaches under the CDM with a view to reduced its transaction costs and simplifying additionality analysis. Case studies on selected sectors and industries. international 2009-2010
Additionality Study international utility (confidential) Establishing a confidential report of additionality determination in the CDM, including case studies international 2009
PoA Blueprint II KfW Bankengruppe Update of the PoA blueprint book established in 2008 expansion with case studies international 2009-2010
PoA Blueprint KfW Banken- gruppe Analysis of chances for PoAdevelopment in the sectors lighting, household stoves, industrial boilers, solar water heating, domestic biogas and building refurbishment   international 2008