| Project Name |
Client |
Project Description |
Location |
Duration |
| CDM PoA Management for a wind energy PoA in South Africa |
confidential |
Development and management of a CDM Programme of Activities (PoA) in South Africa for wind energy projects |
South Africa |
2011 - 2012 |
| CDM Methodology Revision ACM 0001 |
EnBW |
Revision of CDM Methodology ACM0001 "Consolidated baseline and monitoring methodology for landfill gas project activities" |
- |
2011 |
| CDM PoA Management for two multi- country PoAs in Africa for energy efficient cook-stoves |
confidential |
Development of 2 multi-country CDM PoAs in Africa applying energy efficient cook-stoves. Development of PoA design, PoA documentation, support for PoA validation and registration and support for the monitoring of the PoAs |
i.a. Kenya, South Africa, Nigeria, Ghana, Mozambique, Liberia |
2011 |
| CDM Project and Methodology Strategy support for landfill gas projects |
EnBW |
Ad-hoc support on the design strategy and revision of ACM0001 for landfill gas projects |
Colombia |
2011 |
| CDM Feasibility Assessment for cement blending projects in North Africa |
confidential |
CDM Feasibility Assessment for a cement blending project in North Africa |
North Africa |
2011 |
| CDM ad-hoc support for two PoAs |
confidential |
Support in the assessment and applicability check for 3 PoAs in Latin America, Asia and Africa |
Latin America, Asia, Africa |
2011 |
| CDM Methodology development for new and existing adipic acid production capacities |
confidential |
Development of a large-scale CDM metodology, including PDD development and DOE contracting for new and existing adipic acid production capacities |
- |
2011 |
| CDM Feasibility Study on the development of an urban CDM for the City of Gwangju - South Korea |
UNEP |
CDM Feasibility Study to map typical metropolitan areas in South Korea and UEA cities, assessment of priority sectors for emission reductions in urban context, existing methodologies and projects/PoAs with urban context, analysis of potential and opportunities for urban CDM |
South Korea / International |
2011 |
| CDM PoA Feasibility Assessment for various technologies in Saudi-Arabia |
CES Energy Limited |
Assessment and analysis of the CDM potential and applicability of CDM methodologies for trigeneration, building efficiency, electric chillers, ORC technologies and waste water projects in general and as PoAs in the context of Saudi-Arabia |
Saudi-Arabia |
2011 |
| Sampling Manual for the CDM with a specific view to PoAs |
KfW |
Development of a sampling manual for CDM projects and PoAs for practical application. Providing appropriate sampling methods, pitfalls, guidelines and case studies of existing and most relevant sampling approaches within the CDM |
- |
2011 |
| CDM Due Diligence for a large-scale wind energy project in India |
Shell Trading |
CDM Due Diligence and PDD review for a large-scale wind energy project in India |
India |
2011 |
| CDM Due Diligence for an efficient cook-stove project / PoA in Haiti |
Enel Trade |
CDM Due Diligence and PDD review including on-site visit for a CDM project/PoA for the distribution of efficient cook-stoves in Haiti |
Haiti |
2011 |
| CDM Study and workshop on existing CDM potential and perspectives for Carbon Finance in RCREEE Member States beyond 2012 |
Regional Centre for Renewable Energies and Energy Efficiancy (RCREEE) |
Develop five individual country studies for Lebanon, Jordan, Libya, Yemen and Syria. Assessment of status quo and analysis of current institutional and project specific potential for CDM and PoAs. Final workshop with RCREEE member states |
Jordan, Lebanon, Libya, Syria, Yemen, Egypt, Marocco, Tunesia |
2011 |
| Review of Methodology ACM0017for revision |
EnBW |
Review of CDM Methodology ACM0017 "Production of biodiesel for use as fuel" prior to Request for Revision |
- |
2011 |
| Memo on implications/ procedures of including additional host countries after registration of a Programme of Activities |
Mabanaft Carbon B.V. |
Development of a Memo and Manual for PoA developers to assess implications and considerations for developing PoA documents that enable the inclusion of additional host countries post registration |
international |
2011 |
| New large-scale methodology development in steel sector |
confidential |
Development of a new large-scale methodology based on a benchmarking approach in the iron and steel manufacturing process |
North Africa |
2011 |
| CDM Scoping Study and Portfolio Assessment Morocco including PoAs |
GIZ |
Identification and Assessment of CDM opportunities and potential Coordinating Entities for PoA development in Morocco |
Morocco |
2011 |
| Guidelines on how to determine carbon content and emissions factors of fuels in KSA |
Saudi-Aramco |
Develop guidelines on how to determine carbon content and emission factors of fuels in KSA for the use in CDM project activities and PoAs |
Saudi-Arabia |
2011 |
| Development of Grid Emission Factor for Saudi-Arabia |
Saudi-Aramco |
Data gathering and development of Grid Emission Factor according to the CDM Guidelines for Saudi-Arabia |
Saudi-Arabia |
2011 |
| Capacity Building and Virtual Operation of the DNA of Saudi-Arabia |
Saudi-Aramco |
Review and evaluation of project applications, Technical Project Evaluation Report, etc. |
Saudi-Arabia |
2011-2012 |
| Development of the Grid Emission Factor for Panama |
confidential |
Data gathering and development of grid emission factor according to the CDM guidelines |
Panama |
2010-2011 |
| CDM PoA Risk Assessment LED lighting in India |
confidential |
CDM PoA Risk Assessment for a LED lighting PoA in India |
India |
2011 |
| CDM PoA Management Latin America (Renewable Energies) |
confidential |
PoA Management and data gathering for a multi-country wind PoA in Latin America |
Argentina/ Brazil |
2011 |
| CDM Request for Revision of Monitoring Plan |
confidential |
Preparing and conducting a request for revision of the monitoring plan for a hydro power project in Chile |
2011 |
Chile |
| CDM Risk Assessment Landfill Colombia |
EnBW |
CDM Risk Assessment (PDD Review) for a landfill project in Colombia |
Colombia |
2011 |
| CDM Feasibility Assessment waste to energy |
confidential |
CDM Feasibility Study for waste management opportunities in the metropolitan area of Nairobi |
Kenya |
2011 |
| Innovative Tools to lower the Entry Barriers and allow for Scaling-up of Carbon Market Activities in underrepresented regions |
German Federal Ministry for the Environment, Nature Conservation and Nuclear Safety |
Development of 3 Methodologies, conducting capacity building workshops and stakeholder consultations; development of a blueprint book on suppressed demand |
Least developed countries |
2011-2014 |
| CDM Risk Assessment Biomass Co-Gen Malaysia |
confidential |
CDM Risk Assessment with the focus on additionality for a Biomass Co-Generation Project in Malaysia |
Malaysia |
2011 |
| CDM PDD Review for Biogas bundle |
EnBW |
Review of a CDM PDD for a SSC bundle (biogas) in Thailand |
Thailand |
2011 |
| CDM Verification Support India |
Torrent Power |
CDM Verification Support for the 3rd verification of a Combined Cycle Power Generation Plant in India |
India |
2011 |
| CDM Risk Assessment Hydro Peru |
EnBW |
CDM PDD Review ans Risk Assessment for a Hydro Power Project in Peru |
Peru |
2011 |
| CDM Ad-hoc Advisory Support for a wind power project in China |
confidential |
CDM Ad-hoc Advisory Support for a wind power project in China during Request for Review |
China |
2011 |
| CDM Risk Evaluation Biomass Co-Gen Malaysia |
confidential |
CDM Risk Evaluation for Biomass Co-Generation Projects in Malaysia |
Malaysia |
2010 |
| CDM Project Management Hydro power Panama |
SN Power |
CDM Project Manamgent including PDD development, Validation and Registration Support for a LSC Hydro Power Project |
Panama |
2010-2011 |
| CDM Risk Assessment Hydro Laos |
EnBW |
CDM PDD Review and Risk Assessment for a Hydro-Power Project |
Laos |
2010 |
| CDM Verification Support biomass projects Thailand |
EnBW |
Verification support for 2 biomass CDM projects (bio-energy co-generation) in Thailand |
Thailand |
2010 |
| CDM Ad-hoc Advisory Support for a hydro power project in China |
confidential |
CDM Ad-hoc Advisory Support for a hydro power project in China during a Request for Review |
China |
2010 |
| CDM Project and PoA Scoping Study in Uganda/Africa |
GTZ and German Federal Ministry for the Environment, Nature Conservation and Nuclear Safety |
CDM Scoping Study for identifying potential CDM projects and Programme of Activities (PoAs) and providing recommendations for most appropriate capacity building instruments for increasing the CDM potential in Uganda |
Uganda |
2010 |
| CDM Ad-hoc Advisory Support Hydro Latin America |
SN Power |
CDM Ad-hoc Advisory Support for a hydro power project in Latin America |
Chile |
2010 |
| CDM Feasibility Assessment Fuel Switch Cement |
confidential |
CDM Feasibility Assessment for fuel switching in the cement sector |
International |
2010 - 2011 |
| Economic assessment of CDM potentials in the Oil and Gas sector |
Saudi Aramco |
Comprehensive study on long term carbon market and CDM potential, including project cycle costs and revenues for prominent CDM project types for the host country |
Saudi Arabia |
2011-2012 |
| CDM methodology development CCS |
Confidential |
Desk review of a CDM methodology for CCS projects |
International |
2010 |
| CDM standardized baselines |
US EPA |
Study on the greater use of standardized approaches to baselines and additionality under the CDM |
International |
2010-2011 |
| CDM standardized baselines |
UNFCCC |
Synthesis of Parties' and observers' submissions to UNFCCC on standardized baselines under the CDM |
International |
2010 |
| CDM methodology feasibility LFG |
EnBW |
Feasibility study on CDM methodology revision of ACM0001 (use of landfill gas in a gas-fired kiln) |
Colombia |
2010 |
| CDM Mgmt Ad-hoc support Wind China III (post-validation) |
confidential |
CDM ad-hoc support for a wind power project in registration process |
China |
2010 |
| PoA Identification workshop MENA |
GTZ |
Workshop to identify PoA ideas in North Africa and to build capacities |
Morocco |
2010 |
| CDM PDD development for wind power |
Orbeo |
PDD development for wind power project in Morocco |
Morocco |
2010 |
| CDM Mgmt Ad-hoc support Wind China II (pre-validation) |
confidential |
CDM ad-hoc support for a wind power project during the validation |
China |
2010 |
| PoA PIN development building efficiency |
KfW |
On-site visit and PoA PIN development for building efficiency |
Tunisia |
2010 |
| CDM Verification Support Combined Cycle Power Gen |
confidential |
Verification support for a combined cycle power genration project in India |
India |
2010 |
| CDM Mgmt Ad-hoc support Wind China I |
confidential |
Support for a CDM wind project during the completeness check |
China |
2010 |
| PoA PIN development SWH Mexico |
MAMA AG |
Development of the PoA PIN for SWHs in Mexico |
Mexico |
2010 |
| PoA Feasibility Assessment SWH Mexico |
MAMA AG |
CDM PoA Feasibility Assessment for solar water heating systems in Mexico |
Mexico |
2010 |
| PoA Technology Supplier Identification |
confidential |
Identification of technology providers for potential PoAs |
Europe |
2010 |
| CDM Mgmt Ad-hoc Support (Biogas projects) |
EnBW |
Support in specific questions on the application of biogas projects |
Several |
2010 |
| CDM PoA Feasibility Assessment El Salvador |
UNDP |
CDM PoA Feasibility Assessment for energy efficient lighting |
El Salvador |
2010 |
| CDM Feasibility Assessment Biogas |
EnBW |
CDM Feasibility Assessment Biogas |
Indonesia |
2010 |
| CDM Project Mgmt. Ad-hoc Suppor |
SN Power |
Support in the validation process of hydro-power projects in Latin America |
Latin America |
2010 |
| Review and QA/QC of a WCD Report China |
confidential |
Review and QA/QC of a WCD Report for a Hydropower Project in China |
China |
2010 |
| Due Diligence for Biomass Project in India |
confidential |
Due Diligence for Biomass Project in India |
India |
2010 |
| PoA Review and Rating Bangladesh |
confidential |
CDM PoA Review and Rating for Improved Cooking Stoves |
Bangladesh |
2010 |
| CDM PoA Management for wind energy PoA in India |
confidential |
Development and management for a CDM Programme of Activities (PoA) in India for wind energy projects |
India |
2011 - 2012 |
| CDM Pre-Assessment Solar Home Systems |
Misereor e.V. |
CDM Pre-Assessment for a Solar Lamp project in India |
India |
2010 |
| Market study on CDM/JI |
German environmental Protection Agency |
Analysis of the market position of german companies in the global carbon market, and recommandations to the german government on how to (further) improve it |
Germany |
2010-2011 |
| Economics of adaptation |
DEZA |
Ellaboration of an approach to quantify the adaptive effects of adaption projects/programmes; consultancy and advice on project assessment and questions related the Adaption Fund under the Kyoto Protocol and the SCCF under the UNFCCC |
international |
2010-2011 |
| Desk review CDM methodology grid connection |
Climate Focus |
Desk review of a study on CDM methodology development for power grid connection |
Colombia |
2010 |
| CDM methodology development CH4 avoidance |
EnBW |
CDM methodology revision of AMS-III.F (methane avoidance through co-digestion of pulp and wastewater) |
International |
2010 |
| Hydro Power |
confidential |
Desk-based due dilligence including official Vietnamese documentation |
Vietnam |
2010 - 2011 |
| CDM Feasibility Study Boil-off gas |
confidential |
CDM Feasibility Assessment for boil-off gas projects |
Qatar |
2010 |
| CDM Project Management Wind power |
confidential |
CDM project management for a large-scale wind power project in the Kenya |
Kenya |
2010 |
| CDM PoA Management |
confidential |
Support in CDM PoA development for 2 PoAs in the field of renewable energy generation |
Tanzania |
2010 |
| CDM Management Hydro Power |
SN Power |
CDM project management for a large-scale hydro power project in the Chile |
Chile |
2009-2010 |
| CDM PoA Feasibility Assessment |
Though Stuff International |
CDM PoA Feasibility Study for demand side energy efficiency project in the residential sector (CFL) |
Madagascar |
2009-2010 |
| CDM Project Management Energy Efficient Lighting |
Lessoco |
Support in PDD Development and Grid Emissions Factor Calculations |
Eritrea |
2010 |
| CDM Pre-Assessment (two technologies) |
confidential |
CDM Pre-Assessment of two technologies |
not specified |
2009-2010 |
| CDM PoA Feasibility Assessment |
confidential |
CDM PoA Feasibility Assessment for solar water heaters |
South Africa |
2009 |
| Desk review CDM methodology SWH |
confidential |
Desk review of a CDM methodology for a Solar Water Heating |
South Africa |
2009 |
| CDM methodology feasibility RE power |
EnBW |
Feasibility study on CDM methodology development for biomass power generation with plantation wood |
Liberia |
2009 |
| CDM newsletter |
EU utility |
Monthly CDM newsletter highlighting the relevant regulatory decisions in the CDM Executive Board, international negotiations and the US and the implications for the EU utility |
not applicable |
2009 |
| CFL dissemination PoA |
Lessoco AG |
PDD review and improvement for a CFL dissemination project |
Eritrea |
2009 |
| Cook stoves PoA |
confidential |
General risk assessment report for a PoA cook stove project idea |
not applicable |
2009 |
| Landfill Gas |
confidential |
Risk assessment report |
China |
2009 |
| Hydro Power |
confidential |
Risk assessment report |
Latin America |
2009 |
| CDM Pre- Assessment Energy Efficient Lightning |
confidential |
CDM Feasability Assessment Energy Efficient Lighting |
Eritrea |
2009 |
| CDM Verification Support |
confidential |
CDM Verification Support for Combined Cycle Power Generation Plant |
India |
2009 |
| CDM/ JI PoA Feasability Study Energy Efficient Lightning |
confidential |
CDM Feasability Study for demand side energy efficiency project in the residential sector (CFL) |
Indonesia |
2009 |
| CDM Feasibility Study Pyrolysis |
confidential |
CDM Feasibility Assessment for a waste -to-energy project |
- |
2009 |
| Grid Emission Development |
confidential |
Development of the Grid Emission Factors for several countries |
several |
2009 |
| Cement industry |
confidential |
PDD review and improvement of a waste heat recovery project in cement industry |
Latin- America |
2009 |
| Cement industry |
confidential |
PDD review and improvement of a cement blending project |
Latin- America |
2009 |
| hydro power |
confidential |
Risk assessment report with regard to WCD compliance for a hydro power plant |
confidential |
2009 |
| New energy efficiency project type |
confidential |
Risk assessment report for a new type of CDM project in energy efficiency with regard to methodology applicability and additionality |
confidential |
2009 |
| CFL dissemination |
confidential |
Risk assessment report for a CDM project involving the large-scale distribution of energy saving lamps (CFL) |
confidential |
2009 |
| CCNG |
Allplan |
PDD review and improvement |
Macedonia |
2009 |
| Project summary report: biomass |
confidential |
In-depth analysis on regulatory risks and CER performance of biomass projects in CDM |
- |
2009 |
| Project summary report on hydro power |
confidential |
In-depth analysis on regulatory risks and CER performance of hydro power projects in CDM |
- |
2009 |
| Project summary report: landfill gas |
confidential |
In-depth analysis on regulatory risks and CER performance of landfill gas projects in CDM |
- |
2009 |
| Project summary report: waste heat recovery |
confidential |
In-depth analysis on regulatory risks and CER performance of waste recovery projects in CDM |
- |
2009 |
| Hydro Power |
confidential |
Risk assessment report |
China |
2008 |
| Hydro Power |
confidential |
Risk assessment report |
China |
2008 |
| CDM Feasibility Study energy efficiency demand side |
confidential |
CDM feasibility study for demand side energy efficiency project in the residential sector (CFL) |
Egypt |
2009 |
| CDM Project Management energie efficient lighting |
Osram |
CDM project managment for energy efficient lighting project in the residential sector |
India |
2009 |
| CDM Project Management Wind power |
confidential |
CDM project management for a wind power project |
Pakistan |
2009 |
| CDM Feasibility Study Wind power |
confidential |
CDM Feasibility Assessment for a wind power project |
Pakistan |
2009 |
| CDM methodology development RE cooling and de- humidification |
Masdar |
CDM methodology development for RE district cooling and dehumidification in a carbon-neutral city |
UAE |
2009-2010 |
| CDM methodology development buiding efficiency |
Masdar |
CDM methodology development for building efficiency improvement in a carbon-neutral city |
UAE |
2009-2010 |
| CDM methodology development RE power |
Orbeo |
CDM methodology revision of ACM0006 (biomass power generation) |
France |
2009 |
| CDM methodology development RE power |
SN Power |
CDM methodology revision of ACM0002 (rehabilitation of RE power plants) |
Norway |
2009 |
| CDM methodology development agriculture |
Becker Underwood |
CDM methodology revision of AMS-III.A (methodology for inoculant distribution to soybean farmers) |
USA |
2008 - 2009 |
| CDM methodology development sustainable city |
Masdar |
Support for CDM methodology development for construction of a carbon- neutral city |
UAE |
2008 - 2008 |
| CDM methodology development Co2 recovery |
Masdar |
Support for CDM methodology development for Co2 recovery in ammonia/ urea/ methanol integrated plants |
UAE |
2008 - 2009 |
| CDM methodology development co- generation |
Masdar |
Support for CDM methodology development for co- generation in aluminium plants |
UAE |
2008 |
| CDM PoA Identification Energy Efficiency |
KfW |
CDM PoA identification of different project opportunities in the sector of energy efficiency in the power transmission and distribution systems and for agricultural irrigation pumps |
India |
2009 |
| CDM Feasibility and Project Management Cement Industrie |
confidential |
CDM Feasibility studies and project management for several project activities in the cement industry |
international |
2009 |
| CDM Feasibility Sewage Sludge Treatment |
Applied CleanTech |
CDM Feasibility for a sewage sludge treatment technology |
Israel |
2008 |
| Due Diligence reforestation |
confidential |
Due diligence for a CDM reforestation project for commercial wood production |
Tanzania |
2008 |
| WCD compliance report |
confidential |
Analysis of the historic approval practice of large hydro power of five EU member states |
EU |
2008 |
| PDD review hydro power |
confidential |
PDD review and improvement for a hydro power plant |
India |
2008 |
| PDD review supercritical power generation |
confidential |
PDD review and improvement for a supercritical coal- fired power plant |
China |
2008 |
| PDD review hydro power |
confidential |
PDD review and improvement for a hydro power plant |
China |
2008 |
| PDD review hydro power |
confidential |
PDD review and improvement for a hydro power plant |
China |
2008 |
| PDD review hydro power |
confidential |
PDD review and improvement for a hydro power plant |
China |
2008 |
| PDD review coal mine methane |
confidential |
PDD review and improvement for a coal mine methane project |
China |
2008 |
| Risk assessment landfill gas |
confidential |
Risk assessment report landfill gas CDM project |
Peru |
2008 |
| Risk assessment landfill gas |
confidential |
Risk assessment report landfill gas CDM project |
Argentina |
2008 |
| PDD review large hydro power plant |
confidential |
PDD review and quality improvement for a large scale hydro power plant |
India |
2008 |
| CDM methodology development CCS |
confidential |
CDM methodology development for CCS projects |
international |
2008 |
| CDM methodoligy development adipic acid |
confidential |
Support for a CDM methodoligy revision for N2O reduction from adipic acid production |
international |
2008 - 2009 |
| JI Feasibility energy efficiency Industrie |
Quarzwerke |
JI Feasibility Assessment on Silicia Drying Technology in Russia |
Russia |
2008 |
| CDM project risk mitigation handbook |
confidential |
Purpose of the practical handbook is to assisst originators to identify projects that carry significant registration and reputational risks |
-- |
2008 |
| CDM Feasibility Hydro Power |
SNPower |
CDM Feasibility Assessment on hydro power plant |
Philippines |
2008 |
| CDM Feasibility supercritical power generation |
AES |
CDM Feasibility Assessment on supercritical power plant |
Pakistan |
2008 |
| CDM Feasibility gas power generation |
AES |
CDM Feasibility Assessment on a gas fired power plant |
Cameroon |
2008 |
| CDM Feasibility CO2- Recovery |
Fatima Group |
CDM Feasibility Assessment for a CO2- Recovery project in fertilizer industry |
Pakistan |
2008 |
| CDM methodology development fossil power plant energy efficiency |
confidential |
CDM methodology development for fossil power plant refurbishment projects with a package of energy efficiency measures |
international |
2008 - 2009 |
| Risk assessment power generation |
confidential |
PIN evaluation of a greenfield waste gas recovery project for power generation. |
China |
2008 |
| Risk assessment afforestation II |
confidential |
PIN evaluation of an afforestation project for charcoal production. |
Africa |
2008 |
| CDM power generation India |
confidential |
CDM management including development of PDD for a greenfield power generation project. |
India |
2008 - 2009 |
| CDM feasibility afforestation |
FIT Timber Growth Fund |
CDM-feasibility study for an afforestation project for commercial wood production according to FSC. |
Brazil |
2008 |
| CDM in the building sector |
GTZ |
Presentation of status of CDM projects in the building sector. |
Tunisia |
2008 |
| Supercritical power generation India |
confidential |
Supporting the client in CDM management - especially in baseline scenario selection, calculation of levelized electricity costs (LEC) and QA/QC on the PDD and related documentation. |
India |
2008 |
| Methodology development landfill |
Mundus Aer |
Methodology revision aerobic landfill management projects. (request for revision of AM0025) |
USA; international |
2008 |
| PDD review Bionersis |
Bionersis |
Review of landfill gas PDD draft |
France; international |
2008 |
| CDM in China - Study |
World Bank |
Contribution to World Bank's Study on CDM in China - chapter on current status of CDM market. |
China |
2007 - 2008 |
| Desk review CDM Methodology |
confidential |
Desk review of new methodology proposal in the field of biomass energy |
international |
2008 |
| CDM Feasibility Ethylene Oxide |
confidential |
Feasibility study on CDM methodology development for CO2 emission reduction in the ethylene oxide production. |
confidential |
2008 |
| GTZ Africa |
GTZ |
Support of GTZ's CDM capacity building in Africa |
Africa |
2007 - 2008 |
| JI Methodology N2O |
Confidential |
JI-Methodology development for N2O reduction from adipic acid production |
Confidential |
2008 |
| CDM Information Services |
Point Carbon |
Information Services on the status quo of the CDM framework, including analysis of decisions of the CDM EB and other relevant bodies. |
International |
2008 |
| CDM Feasibility wastewater treatment Indonesia |
German Technology Provider |
CDM feasibility assessment for two SSC waste water treatment projects in Indonesia. |
Indonesia |
2008 |
| CER- Channeling german utility |
confidential |
Channeling of a Vietnamese hydro power CDM project activity
Perspectives is not longer involved in brokering. |
Vietnam |
2007 - 2008 |
| Biogas/ -mass Honduras |
Exportadora del Atlantico |
PDD-Development for 2 CDM project activities in the field of waste water treatment / biogas utilization and biomass utilization for heat/electricity generation. |
Honduras |
2007 - 2008 |
| CDM Guide Book 2007 |
DEFRA |
Development of a CDM guide book that summarises relevant CDM rules and explains approved methodologies. |
International |
2007- 2008 |
| N2O project development |
Orica |
PDD development for a N2O reduction project in the nitric acid industry. |
Philippines |
2007 - 2009 |
| Osram PDD Development |
Osram GmbH |
Development of Project Design Documents for CDM projects covering the operation of CFLs in households (energy efficient lighting). Initial projects: "Visakhapatnam Osram GS CDM project" and "Yamunanagar & Sonepat Osram GS CDM project". |
international |
2007 - 2008 |
| CFL Programme of Activities |
GTZ |
Support in understanding UNFCCC rules for CDM Programmes of Activities; preparation of CFL programme in India. |
India |
2007 |
| Risk assessment Power Plant ME |
International CER-Fund |
PIN assessment of conversion from single-cycle to combined-cycle and fuel switch from oil to gas in a power plant. |
Middle East |
2007 |
| Meth Review Gold Standard |
Gold Standard Foundation |
Review of a proposed Gold Standard Methodology (Biogas/-mass) |
international |
2007 |
| CDM-Potential at Indian Railways |
Gesellschaft für Technische Zusammenarbeit (GTZ) |
Analysis of the CDM-Potential at Indian Railways. |
India |
2007 |
| PDD support Torrent Power |
Torrent Power |
Support in PDD development for greenfield gas power plant in Gujarat, India. Successful CDM-registration as project No. 1116. |
India |
2007 |
| Rajburi wastewater project |
Rajburi Ethanol and Sugar Co. Ltd. |
Development of a Gold Standard PDD according to AM0013; management of CDM project cycle; Channelling of Gold Standard CERs.
Perspectives is not longer involved in brokering |
Thailand |
2007 |
| Saha Cogen |
Envima Thailand |
CDM feasibility assessment for a CHP-Installation in Thailand: analysis of applicable methodologies, estimation of CER-volumes, initial additionality check. |
Thailand |
2007 |
| Chumporn II |
Gesellschaft für Technische Zusammenarbeit (GTZ) |
Update of the PDD according to a new version of AM0013 - biogas project in the palm oil industry in Thailand (wastewater treatment). Application of the Gold Standard. |
Thailand |
2007 |
| CER- Channelling Vietnam |
confidential |
Brokering of CERs from more than 10 potential CDM hydro power projects in Vietnam with a total volume of 1,900,000 CERs until 2012 in collaboration with our Vietnamese partner VNEEC
Perspectivs is not longer involved in brokering. |
Vietnam |
2007 |
| Chinese PIN/PDD assessment |
Confidential |
Assessment of 2 PINs and 1 PDD from China submitted to a CER purchasing vehicle. |
China |
2007 |
| CER- Channelling Malaysia II |
Malaysian palm oil mill operator |
Brokering of CERs from 3 potential CDM biomass (1x) and biogas projects (2x) in the palm oil industry in Malaysia with a total volume of 750,000 CERs until 2012.
Perspectives is not longer involved in brokering. |
Malaysia |
2007 |
| PDD- review for CDM-EB* |
UNFCCC - Registration and Issuance Team |
Evaluation of over 60 projects submitted for registration / issuance as a member of the Registration and Issuance Team |
international |
since 2006 |
| Desk reviews of CDM methodologies* |
UNFCCC Secretariat |
Review of 11 baseline and monitoring methodologies submitted to the CDM Executive Board in the fields of cement production, forestry, methane production from agricultural waste, landfill gas collection, energy efficiency in steel production and hydropower, gas power plant refurbishment, gas power plant construction |
international |
since 2003 |
| Nam Pia CER-Channelling |
Vietnamese hydro power plant developer |
Brokering of CERs from a Vietnamese Hydro Power Project; approx. 140,000 CERs up to 2012
Perspectives is not longer involved in brokering. |
Vietnam |
2006 - 2007 |
| JI feasibility in Poland |
Confidential |
JI feasibility study for a wind park in Poland |
Poland |
2006 - 2007 |
| Inoculant Methodology |
Becker Underwood - FCStone Carbon, USA |
Development of a CDM methodology for inoculant distribution to soybean farmers in Brazil to offset N-fertilizer use (methodology submitted to UNFCCC). |
Brazil | international |
2006 - 2007 |
| Biomass power plants Brazil |
CCC Machinery |
CDM management for 4 potential CDM biomass power plants in Brazil |
Brazil |
2006 - 2007 |
| FS India Hydro |
Indian hydro power plant developer |
CDM feasibility study for a small-scale hydro power plant in India. |
India |
2006 - 2007 |
| CDM feasibility for N2O project |
Confidential |
CDM-feasibility study for a N2O reduction project in the nitric acid industry. |
international |
2006 - 2007 |
| CCGT power plant Africa |
Confidential |
CDM management for a combined-cycle natural gas power plant for an African utility. |
Africa |
2006 - 2007 |
| CER- Channelling Brazil |
Brasilian biomass power plant operators |
Brokering of CERs from 4 potential CDM biomass projects in Brazil to German buyers with a total volume of more than 500,000 CERs up to 2012.
Perspectives is not longer involved in brokering. |
Brazil |
2006 - 2007 |
| Usaka Hydro |
Indian hydro power plant developer |
CDM management for a small-scale hydro power plant in India. The project is developed under the Gold Standard label. |
India |
2006 - 2007 |
| CDM Guide |
International food processing company |
Establishment of guidelines for in-house CDM and JI project identification and development for one of the largest international food processing companies (in cooperation with EUtech) |
international |
2006 |
| Economic project assessment |
Confidential |
Assessment of the economic attractiveness of various types of prominent CDM project types |
international |
2006 |
| Technological CDM potential |
Confidential |
CDM feasibility study for a potential CDM project in India for a world-leading supplier of power plant equipment |
India |
2006 |
| Meth support Andean Center |
Andean Center for Economics in the Environment (CAEMA) |
Support in CDM methodology development for fuel switch from fossil fuels to biomass residues in boilers for heat generation (methodology approved as AM0036). |
international |
2006 |
| CER- Channelling Malaysia |
Malaysian palm oil mill operator |
Brokering of CERs from a potential CDM biogas project in Malaysia to a German utility. Volume: 30,000 CERs/year. ERPA signed.
Perspectives is not longer involved in brokering. |
Malaysia |
2006 |
| Meth support SSN |
South South North |
Support in CDM methodology development for co-firing of biomass in an industrial boiler (heat generation). |
international |
2006 |
| Shell CDM project feasibility |
Shell Trading International |
CDM feasibility assessment for three potential CDM projects. |
confidential |
2006 - 2007 |
| CRIEPI III - Meth-Development |
Central Research Institute of the Electric Power Industry |
Development of 2 CDM methodologies for:
- Replacement or refurbishment of fossil fuel-fired steam boilers. The CDM-EB approved the submitted methodology as AM0056 in August 2007.
- Greenfield supercritical coal-fired power plants. In September 2007, the CDM-EB approved the consolidated methodology ACM0013 "New grid connected fossil fuel fired power plants using a less GHG intensive technology”, which is largely based on Perspectives' methodology submission.
|
international |
2005 - 2007 |
| CRIEPI II |
Central Research Institute of the Electric Power Industry| Hamburg Institute of International Economics |
Evaluation of the submission and approval process of energy efficiency CDM methodologies. |
international |
2005 - 2006 |
| Chumporn wastewater project |
Gesellschaft für Technische Zusammenarbeit (GTZ) |
CDM management for a biogas project in the palm oil industry in Thailand (wastewater treatment). Application of the Gold Standard. |
Thailand |
2005 - 2006 |
| CRIEPI I |
Hamburg Institute of International Economics |
Evaluation of the CDM potential of selected large-scale energy efficiency technologies in the heavy industry and power generation |
international |
2005 |
| Offset project selection |
Gesellschaft für Technische Zusammenarbeit (GTZ) |
Selection of a potential CDM project to be contracted by the GTZ on the basis of a portfolio of 15 projects preliminarily identified by GTZ. |
international |
2005 |
| Meth support Torrent Power |
Torrent Power |
Support in CDM methodology development for a greenfield combined-cycle natural gas power plant (methodology approved as AM0029). |
India| international |
2005 |
| Meth support Zenith Energy |
Zenith Energy/Factor Consulting AG |
Support in CDM methodology development for the production and use of biodiesel in transportation. |
India |
2005 |
| N2O projects Rhodia |
Rhodia International |
CDM management for two N2O reduction projects in the adipic acid industry in South Korea and Brazil. The projects were registered in 2005 (registered CDM project activities No. 0099 and 0116) and are expected to generate 12,000,000 CERs per year. |
South Korea| Brazil |
2005 |
| Power plant project check |
Siemens AG |
CDM feasibility assessment for a CDM project idea in the power generation sector. |
confidential |
2005 |
| Osram methodology development |
Osram GmbH |
Development of a CDM methodology for replacement of incandescent lamps by compact fluorescent lamps (CFLs) in private households, which has been approved by the CDM EB in early of 2007. |
international |
2004 - 2007 |
| Rhodia methodology development |
Rhodia International |
Development of a CDM methodology for N2O reduction in the adipic acid industry (methodology approved as AM0021). |
international |
2004 - 2005 |
| Development of CDM project database* |
German Ministry for the Environment |
Development of criteria to evaluate quality of German JI/CDM projects |
international |
2003 - 2005 |
| PIN- assessment KfW |
Kreditanstalt für Wiederaufbau (KfW) |
Assessment of 8 Project Idea Notes (PINs) submitted to the KfW Fund. |
international |
2004 |
| Prokon district heating boilers |
Prokon Nord Energiesysteme GmbH |
Draft of a CDM methodology for rehabilitation of boilers in a district heating system. |
Mongolia |
2003 - 2004 |
| Wind power PDD China * |
Gesellschaft für Technische Zusammenarbeit (GTZ) |
Baseline and monitoring methodology and PDD for a CDM wind power project |
China |
2003 |
| PIN-assessment Helio |
Helio International |
Assessment of 4 PINs developed in the context of the SouthSouthNorth project. |
international |
2003 |
| PDD Cosmos Consulting II* |
Cosmos Consulting |
CDM management for a potential small-scale hydro power project in India. |
India |
2003 |
| PDD Cosmos Consulting I* |
Cosmos Consulting |
CDM management for a potential CDM waste incineration project in India. |
India |
2003 |
| PDD Ferrostaal* |
Ferrostaal AG |
Development of baseline and monitoring methodology and PDD for a potential CDM project (new methanol production plant). |
Trinidad & Tobago |
2002 - 2004 |
| PROBASE* |
EU Commission, DG Environment |
PROBASE (Procedures for accounting and baselines for projects under Joint Implementation and the Clean Development Mechanism) provided recommendations to policy makers on how to operationalise and standardise baseline determination for JI and CDM projects. |
international |
2001 - 2002 |
| Potential of Kyoto Mechanisms* |
Volkswagen AG |
Analysis of different options for the use of the Kyoto Mechanisms in German climate policy and identification of new business segments and products for VW. |
Germany |
2000 |
| Kyoto Mechanisms Expert Network (KEEN)* |
EU Commission, DG Research |
Establishment of an international network of specialists in the area of the Kyoto Mechanisms (private sector, governments, universities, NGOs and supra-national organisations) |
EU |
2000 - 2002 |
| Project Name |
Client |
Project Description |
Location |
Duration |
| NAMA concept development Mexico for EE in housing |
German Federal Environment Ministry Mexican Federal Environment Ministry Mexican National Housing Commission |
The aim of the assignment was to review the ongoing and planned Mexican GHG reduction programmes in the national housing sector and to develop a concept for a Nationally Appropriate Mitigation Action (NAMA) that builds upon these programmes and develops them further in such a way that the NAMA is practically implementable and can attract donors to support its practical implementation. The NAMA concept has been showcased at the COP16 in December 2010 as one of a very few NAMA pilots that had advanced to such level of detail at that point in time. The project was conducted jointly with Point Carbon Global Advisory Services (lead). |
Mexico |
2010-2011 |
| Study on Mobilizing NAMAs and new market mechanisms to harness mitigation in RCREEE member states |
Regional Centre for Renewable Energies and Energy Efficiency (RCREEE) |
Overview of NAMAs and new market mechanisms; EU policy regarding bilateral agreements on sectoral crediting and pros and cons for RCREEE member states |
RCREEE member states |
2011 |
| CDM project finance training course |
UNFCCC |
Conduction of two training workshops on CDM project finance and additionality assessment |
international |
2011 |
| Design study for Fuel Security Certificate market mechanism |
ADB |
Study on design features of a Fuel Security Certificate system in the Asian region and conceptualisation of a market mechanism system for the same |
Asian region |
2011 |
| Economic assessment of CDM potentials in the Oil and Gas sector |
Saudi Aramco |
Comprehensive study on long term carbon market and CDM potential, including project cycle costs and revenues for prominent CDM project types for the host country |
Saudi Arabia |
2011-2012 |
| CDM post 2012: review of UNFCCC regulations |
Ministry for Petroleum and Natural Resources Saudi Arabia |
Review and analysis of any successor agreement of the Kyoto Protocol and implications for CDM host countries. Development of post-2012 strategy |
Saudi Arabia |
2011-2012 |
| Guidelines on carbon emission factors of fuel |
DNA Saudi Arabia |
Elaboration of guidelines on how to determine carbon content and emission factors of fuels in KSA for publication on DNA website |
Saudi Arabia |
2011-2012 |
| Benchmarking study N2O projects |
Rhodia Energy |
Study on the future of adipic acid emission credits under consideration of various potential future market mechanisms, including benchmarking potential |
EU |
2011 |
| Support of the German Emissions Trading Group |
Adelphi Research |
Support of the German Emissions Trading Group on an Co-Chair of its subworking group "project based mechanisms" |
Germany |
2011 |
| CDM Highlights |
GIZ |
Monthly CDM Newsletter for the German Gesellschaft für Internationale Zusammenarbeit |
Germany |
2011-2012 |
| IEA-REDT Renewable Energy Promotion policies |
IEA |
Scoping Study: linking renewable Energy Promotion Policies with international Carbon Trade |
International |
2011 |
| Economic instruments for adaptation |
EU Commission |
Study on economic instruments such as risk sharing instruments (e.g. insurance), market based instruments and public private partnerships for adaptation within the EU |
EU |
2010-2011 |
| Bilateral crediting mechanism |
JETRO/METI |
Analysis of design options for a bilateral crediting mechanism and preconditions for international recognition and linking |
Japan |
2010-2011 |
| Monitoring performance of adaptation projects |
GTZ |
Assessment of indicators for the adaptive performance of adaptation projects in GTZ's portfolio, and comparison with indicators used in non-adaptation projects. Policy recommendations. |
Latin America, Carribean |
2010-2011 |
| UNFCCC Project Finance Training |
UNFCCC |
Provision of a series of project finance training course, focussing on financial evaluation of CDM project activities, selection of financial benchmarks, additionality guidance. |
International |
2010-2011 |
| EP Environmental Comitee Advice |
European Parliament |
Consultation of the Environmental Committee of the European Parliament on matters related to international climate policy, Kyoto Mechanisms and post 2012 regime in the ongoing legislative period (details tbd). |
Europe |
2010-2014 |
| German Emissions Trading Group 2010 |
Adelphi Research |
Supporting & consulting the German Emissions Trading Group ("Arbeitsgruppe Emissionshandel, AGE") with a focus on CDM/JI |
Germany |
2010 |
| Strategy development for post - 2012 climate policy |
MASDAR |
Analysis of relevant post-2012 negotiation issues an UN-level, and support with preparation and review of COP 15. |
United Arab Emirates |
2009-2010 |
| GTZ CDM Highlights |
GTZ |
Writing of GTZ' monthly newsletter "CDM Highlights" |
international |
2010 |
| DNA capacity building workshop Algeria |
GTZ |
Conduction of a introductory CDM training workshop for DNA members of Algerian DNA |
Algeria |
2010 |
| Potential and challenges of benchmarking in the CDM |
Department for International Development (DFID) |
Analysis of the potential of benchmarking approaches under the CDM with a view to reduced its transaction costs and simplifying additionality analysis. Case studies on selected sectors and industries. |
international |
2009-2010 |
| Additionality Study |
international utility (confidential) |
Establishing a confidential report of additionality determination in the CDM, including case studies |
international |
2009 |
| PoA Blueprint II |
KfW Bankengruppe |
Update of the PoA blueprint book established in 2008 expansion with case studies |
international |
2009-2010 |
| Review of World Future Council`s proposal on a REP- Fund |
World Future Council |
Review of a proposal of the WFC to establish a REP-Fund for supporting renewable energy projects beyond the CDM |
international |
2009 |
| Climat policy in Indonesia |
EcoPerspectives |
Analysis of policy and sectoral CDM - opportunities for Indonesia |
Indonesia |
2009 |
| Sectoral approaches in the post-2012 regime |
Bundesumwelt- Ministerium |
Study on the potential and implementation options of sectoral approaches in the post-2012 climate policy regime |
international |
2009-2010 |
| Vattenfall Seller's Handbook |
Grue Hornstrup |
Contribution to Vattenfall's Handbook for CER-Sellers: chapters on CDM-Market Trends and ERPAs |
international |
2009 |
| PoA Blueprint |
KfW Banken- gruppe |
Analysis of chances for PoAdevelopment in the sectors lighting, household stoves, industrial boilers, solar water heating, domestic biogas and building refurbishment |
international |
2008 |
| CDM Plattform Latin America |
German Environment Ministry |
Continuation and further enhancement of the CDM Plattform Latin America |
Germany, Latin America |
2008 - 2009 |
| GTZ CDM Highlights |
GTZ |
Writing of GTZ´s monthly newsletter "CDM Highlights" |
international |
2008 - 2009 |
| German Emissions Trading Group 2009 |
Adelphi Research |
Supporting and consulting the German Emissions Trading Group ("Arbeitsgruppe Emissionshandel, AGE") with a focus on CDM/JI |
Germany |
2005 - 2009 |
| Future CDM: how to design the CDM to achieve global GHG reductions |
German Environmental Protetion Agency |
Study on CER- discounting, ambitious baselines, shortening of crediting periods, and voluntary retirement of CERs as options to establish a CDM with effective GHG reductions |
international |
2008 - 2010 |
| CDM and the waste sector |
German Environment Ministry / BIFA |
Study on the role of the waste sector in the CDM, current approaches and rules, as well as potential for optimization |
international |
2008 - 2009 |
| CDM Post 2012 Study |
DEFRA |
Study on the CDM Post 2012 - regulative framework and market developments. |
international |
2008 |
| CDM in the building sector |
GTZ |
Presentation of status of CDM projects in the building sector. |
Tunisia |
2008 |
| CDM in China - Study |
World Bank |
Contribution to World Bank's Study on CDM in China - chapter on current status of CDM market. |
China |
2007 - 2008 |
| CDM Information Services |
Point Carbon |
Information Services on the status quo of the CDM framework, including analysis of decisions of the CDM EB and other relevant bodies. |
International |
2008 |
| CDM Guide Book 2007 |
DEFRA |
Development of a CDM guide book that summarises relevant CDM rules and explains approved methodologies. |
International |
2007- 2008 |
| UNFCCC - 2007 |
German Environment Ministry |
Support with UNFCCC-negotiations during German EU-Presidency. Focus at SB-26: Demonstrable Progress Reports, Art. 6 of the Convention, Mitigation Workshops |
international |
2007 |
| CDM in China |
World Bank |
Contribution to the World Bank's CDM-China-Study: writing chapter on "International Carbon Market and CDM-supply and -demand". |
China |
2007 |
| Economic chances of climate policy |
German Ministry for the Environment |
Analysis of economic chances and risks to German business due to climate change policy |
Germany |
2006 - 2007 |
| CRIEPI II |
Central Research Institute of the Electric Power Industry| Hamburg Institute of International Economics |
Evaluation of the submission and approval process of energy efficiency CDM methodologies. |
international |
2005 - 2006 |
| CCS in the CDM |
Confidential |
Analysis of eligibility of carbon capture and sequestration (CCS) projects in the CDM |
international |
2005 - 2006 |
| Munich Climate Insurance Initiative* |
Germanwatch |
Options for insuring climate-related damages in developing countries (www.climate-insurance.org) |
international |
2005 - 2006 |
| Effects of climate change on Alps |
Germanwatch |
Knowledge synthesis on climate change effects in the European Alps |
EU |
2004 - 2005 |
| Adaptation to increasing sea levels |
Germanwatch |
Case studies on adaption to climate-change: sea level-rise in the Netherlands and in Bangladesh |
The Netherlands| Bangladesh |
2004 - 2005 |
| Development of CDM project database* |
German Ministry for the Environment |
Development of criteria to evaluate quality of German JI/CDM projects |
international |
2003 - 2005 |
| Bhutan technical assistance |
Institute for Environmental Studies (IVM), The Netherlands |
Technical assistance to climate change studies in Bhutan in particular support in domestic vulnerability assessments. |
Bhutan |
2003 - 2004 |
| Point Carbon - Information Services |
Point Carbon |
CDM market and policy analysis. |
international |
2003- ongoing |
| CDM Guide |
International food processing company |
Establishment of guidelines for in-house CDM and JI project identification and development for one of the largest international food processing companies (in cooperation with EUtech) |
international |
2006 |
| HEW - cooperation* |
Hamburg Electricity Company (now: Vattenfall Europe) and HWWA |
Consulting on German and international climate policies with a focus on emissions trading and the Kyoto Mechanisms and implications on energy industries. |
Germany |
2000 - 2003 |
| PROBASE* |
EU Commission, DG Environment |
PROBASE (Procedures for accounting and baselines for projects under Joint Implementation and the Clean Development Mechanism) provided recommendations to policy makers on how to operationalise and standardise baseline determination for JI and CDM projects. |
international |
2001 - 2002 |
| Potential of Kyoto Mechanisms* |
Volkswagen AG |
Analysis of different options for the use of the Kyoto Mechanisms in German climate policy and identification of new business segments and products for VW. |
Germany |
2000 |
| Kyoto Mechanisms Expert Network (KEEN)* |
EU Commission, DG Research |
Establishment of an international network of specialists in the area of the Kyoto Mechanisms (private sector, governments, universities, NGOs and supra-national organisations) |
EU |
2000 - 2002 |
| National Strategy Study (NSS) on CDM* |
Gesellschaft für Technische Zusammenarbeit (GTZ) |
Assistance to Indonesian writing team in evaluation of international CDM rules, assessment of market potential of Indonesia and its marginal abatement costs as well as institutional requirements for CDM. |
Indonesia |
2000 - 2001 |
| Linking development aid and CDM projects* |
Kreditanstalt für Wiederaufbau (KfW) |
Study on interpretation of ?diversion? of development assistance through CDM projects |
international |
2000 |